Bare land stratas have fewer moving parts than a condo tower, but the parts they have are large and easy to neglect: roads, water systems, landscaping and design bylaws.

A bare land strata looks nothing like a condo tower. The homes are detached, each sits on its own lot, and owners mow their own lawns. It is easy to conclude that there is not much for the strata to manage.

Then the private road needs repaving, the community water system fails a test, the entrance landscaping is overgrown, three owners have painted their houses colours the original design guidelines never contemplated, and nobody can find the depreciation report. Bare land stratas tend to have fewer moving parts than a high-rise, but the parts they do have are large, expensive and easy to neglect.

This guide covers what is genuinely different about managing a bare land strata in BC, and when professional management starts to make sense.

This article is general information about bare land strata corporations under the Strata Property Act and its Regulation, not legal advice. Your strata plan, registered bylaws and any local government or health authority requirements govern the details. Confirm specifics with a strata lawyer, your insurance broker and the relevant authorities.

What makes a strata "bare land"

The Act defines a bare land strata plan as one on which the boundaries of the strata lots are defined on a horizontal plane by reference to survey markers, not by reference to the floors, walls or ceilings of a building. In plain terms, owners own parcels of land rather than airspace inside a building.

That one difference cascades through the rest of the Act. A conventional strata plan must show the location of the buildings; a bare land strata plan does not have to for its strata lots. And several Standard Bylaws expressly exclude bare land lots. For the basics of ownership and insurance, see what is a bare land strata. This article is about running one.

The strata usually maintains infrastructure, not houses

Under section 72, a strata corporation must repair and maintain common property and common assets. In a bare land strata, the common property is often the infrastructure that makes the subdivision work:

  • private roads, curbs, sidewalks and street lighting
  • water systems: wells, pumps, reservoirs, distribution mains
  • sewage and stormwater systems: shared septic fields, lift stations, ditches, detention ponds
  • entrance features, gates and fencing
  • landscaped common areas, trails, parks and amenity buildings
  • mailbox kiosks, signage and lighting

At the same time, the Standard Bylaws largely leave the houses alone. Standard Bylaw 8 limits the strata's duty to repair parts of strata lots (structure, exterior, windows and so on) to strata plans that are not bare land plans. So, unless your registered bylaws say otherwise, owners in a bare land strata are responsible for their own homes, and the strata is responsible for the shared land and systems.

That inversion is the heart of bare land management. The strata's big-ticket items are underground or underfoot, and they fail on long cycles that are easy to forget about until they cost a fortune.

Insurance follows the strata plan

Section 149 requires a strata to insure common property, common assets and buildings shown on the strata plan. The separate obligation to insure original fixtures in strata lots expressly does not apply to a bare land strata plan, and section 161 confirms that a bare land owner may insure the buildings and fixtures on their own lot.

What this means in practice depends on your plan: whether any buildings are shown on it, and which structures sit on common property. The strata still needs property insurance on its common assets and amenity buildings and liability insurance for its common areas, and owners need to understand what they must insure themselves. Have your broker review the plan with council rather than assuming the answer.

Water, sewer and septic systems

Shared water and wastewater systems are where bare land stratas carry the most risk and the least in-house expertise.

  • Treat them as regulated systems. A strata-operated water system may be subject to BC's drinking water requirements, and shared on-site sewage systems to provincial and health authority rules. Contact your regional health authority to confirm what applies to your system, and keep the correspondence on file.
  • Contract a qualified operator. Most councils should not be running water testing and pump maintenance themselves. A written service contract with a qualified operator, with reports delivered to the strata, protects both the residents and the council.
  • Keep the records. Test results, maintenance logs, operator reports and any orders or permits belong in the strata's records. The Act requires the strata to retain reports respecting repair or maintenance of major items, including engineers' reports and sanitation reports.
  • Plan for replacement. Pumps, controls, lagoons and septic fields have finite lives. They belong in the depreciation report and the reserve plan, not in an emergency special levy.

Depreciation reports and reserves

Bare land stratas are not exempt from depreciation reports. The Regulation's list of items a report must cover includes parking facilities and roadways, utilities, including water and sewage, and landscaping, including paths, sidewalks, fencing and irrigation, which reads almost like a description of a bare land subdivision.

Current requirements, under the Regulation:

  • A strata must obtain a new depreciation report at least once every 5 years.
  • A strata established before July 1, 2024 that had not obtained a report since December 31, 2020 had to obtain one before July 1, 2026 if located wholly or partly in Metro Vancouver or the Fraser Valley Regional District, and before July 1, 2027 elsewhere.
  • A strata with fewer than 5 strata lots is exempt for as long as that remains the case.
  • For reports obtained on or after July 1, 2025, the person preparing the report must hold one of the professional designations listed in the Regulation.

The annual contribution to the contingency reserve fund must be set after considering the most recent depreciation report and must be at least 10% of the total budgeted contribution to the operating fund. For a strata whose largest asset is a few kilometres of private road, 10% is a floor, not a plan. See the depreciation report deadline and how a strata budget is built.

Bylaws for building exteriors and lot use

In a conventional strata, the strata controls exteriors because it maintains them. In a bare land strata, owners maintain their own homes, so control over appearance has to come from the bylaws.

Note that Standard Bylaw 5, which requires an owner to get written approval before altering the structure or exterior of a building, does not apply to a strata lot in a bare land strata plan. If your community wants design controls, such as approval for exterior colours, fences, outbuildings, additions, tree removal or RVs on driveways, it needs custom bylaws that say so.

A few cautions when drafting or enforcing them:

  • Amendments need a 3/4 vote at a general meeting and filing in the land title office before they take effect. In a bare land strata, no amendment can be made before the second annual general meeting unless it is passed unanimously.
  • Bylaws must not contravene other law, including the Act, the Regulation and the Human Rights Code. Bylaws that do are unenforceable to the extent of the conflict. See unenforceable strata bylaws.
  • Write objective standards. "Approval not to be unreasonably withheld", a published colour palette and a defined application process will hold up better than "subject to council's discretion".
  • Enforce consistently, through the section 135 process, every time. Uneven enforcement in a small community is the fastest route to a significant-unfairness claim. See the alteration request and approval process.

Governance in a community of neighbours

The governance machinery is the same as any strata: annual general meetings, budgets, council, minutes and records. Two features are particular to bare land:

  • Unit entitlement is usually equal. Under section 246, each bare land lot's unit entitlement must be the same whole number for every lot, unless the superintendent approves a different allocation. Strata fees are therefore often equal across lots, even when lots differ greatly in size.
  • Owners often see themselves as homeowners, not strata owners. Many buyers do not fully appreciate they are joining a strata corporation with fees, bylaws and shared liabilities. Clear onboarding information for new owners saves a great deal of friction later.

When professional management makes sense

Many bare land stratas self-manage successfully, especially small ones with simple infrastructure. The case for professional management tends to build when:

  • the strata operates water or wastewater systems that need contracted operators, reporting and records
  • a road, drainage or utility project is coming that needs tendering, contracts and owner communication
  • the depreciation report shows a funding gap that needs a multi-year plan
  • design bylaw enforcement is pitting neighbours against each other and needs a neutral party
  • council volunteers are burning out, or the same two people have done everything for a decade
  • the strata needs proper financial statements, collections and records to support sales and refinancing

A manager experienced with bare land work understands that the job is contracts, infrastructure and governance rather than elevators and envelopes. See self-managed versus professional strata, strata management for small buildings and how to choose a strata management company.

Frequently asked questions

Does a bare land strata need a depreciation report in BC? Yes, unless it has fewer than 5 strata lots. The Regulation requires a new report at least every 5 years, and its required items include roadways, water and sewage utilities and landscaping.

Does the strata maintain the houses in a bare land strata? Usually not. Under the Standard Bylaws, the strata's duty to repair parts of strata lots does not apply to bare land plans. The strata maintains common property and common assets, unless your registered bylaws provide otherwise.

Can a bare land strata control what owners do to their homes? Only through bylaws written for that purpose. The Standard Bylaw requiring approval for exterior alterations does not apply to bare land lots, so design controls need custom bylaws passed by a 3/4 vote and filed at the land title office.

Who insures the houses in a bare land strata? It depends on the strata plan. The strata must insure buildings shown on the plan, and the Act confirms that a bare land owner may insure the buildings and fixtures on their own lot. Have your broker review the plan.

Are strata fees equal in a bare land strata? Often. Each bare land lot's unit entitlement must be the same whole number for every lot unless the superintendent approves a different allocation, so contributions are usually shared equally.

Bare land provisions are found throughout the Strata Property Act, and depreciation report and reserve requirements are in Part 6 of the Strata Property Regulation.

Bare land communities fit the way we work: a manageable number of lots, real infrastructure and owners who want it run properly without fuss. Onehive handles contractor management, depreciation planning and bylaw administration for bare land stratas as part of strata management — request a proposal.

Written by

Onehive Property Management

Onehive Property Management manages strata corporations and rental properties across British Columbia. Our guides are written by the people who do the work — council meetings, budgets, insurance renewals and all — and reviewed against the Strata Property Act before publishing.

See where we manage across BC →

Thinking about switching managers?

Tell us about your building. We'll review it, be straight with you about fit, and send a tailored proposal within one business day.